Launch of PSLV-C15 Rescheduled


The launch of ISRO`s Polar Satellite Launch Vehicle (PSLV-C15) fixed for May 9, 2010 has been rescheduled. A marginal drop in the pressure in second stage of the vehicle was noticed during the mandatory checks carried out on the PSLV-C15 vehicle. The new date for the launch of PSLV-C15 mission will be decided after preliminary results of the analysis are obtained.

PSLV-C15 is planned to launch India`s Cartosat-2B, an Algerian satellite ALSAT-2A, two nano satellites NLS 6.1 and NLS 6.2 from University of Toronto, Canada and STUDSAT, a satellite built by students from academic institutions in Karnataka and Andhra Pradesh.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: